
Goodyear Industrial TPO Re-Roof
A distribution building with a 2008 roof and ponding at the drains. Moisture scan found 14% wet insulation, priced before the contract. Tear-off in daily sections with the tenant operating underneath; done in eleven working days; manufacturer inspection passed with no corrections.




