Six recent roofs, with the square footage and the system.

What the building was, how big the roof was, what we installed, and who it was for. References are in the capabilities packet.

Commercial roof tear-off and insulation
Industrial re-roof · 2025

Goodyear Industrial TPO Re-Roof

Size118,000 sq ftScopeTear-off, wet insulation replaced from the scan, tapered polyiso, 60-mil TPO mechanically attached, 20-year NDLForFor the building owner, tenant operating

A distribution building with a 2008 roof and ponding at the drains. Moisture scan found 14% wet insulation, priced before the contract. Tear-off in daily sections with the tenant operating underneath; done in eleven working days; manufacturer inspection passed with no corrections.

Roofer heat-welding TPO seams
Retail re-roof · 2024

Arrowhead Towne Center Outparcels

Size4 buildings, 46,000 sq ftScopeRecover with 60-mil TPO over dry existing roof, new drains and edge metal, 20-year NDLForFor the property manager

Four retail outparcels with dry single-layer roofs that qualified for a recover. Scanned and cored to confirm, recovered over operating restaurants and retail with odor and noise scheduled around the tenants, all four done before monsoon season.

Ridgeline crew on a commercial roof
PVC re-roof · 2024

Avondale Food Processing PVC

Size62,000 sq ftScopeTear-off, 80-mil PVC fully adhered, grease-resistant details at exhaust, 25-year NDLForFor the tenant

A food processing plant whose TPO roof had failed around the kitchen exhaust from grease. Replaced with 80-mil PVC, fully adhered, with grease guards and sacrificial walkway pads at every exhaust. The plant never stopped production.

Crew welding TPO on a commercial roof
Medical office re-roof · 2024

Glendale Medical Plaza Re-Roof

Size28,000 sq ftScopeTear-off, tapered insulation to fix ponding, 60-mil TPO, 14 rooftop units reset, 20-year NDLForFor the building owner

A medical office building with ponding that had ruined two ceilings. Tapered insulation redesigned the drainage, fourteen rooftop units were lifted and reset with the HVAC contractor over two Saturdays, and the physicians never lost a clinic day.

Roofer inspecting a roof drain
Maintenance program · 2022–2025

Deer Valley Office Park Portfolio

Size9 buildings, 196,000 sq ftScopeSemiannual inspection program, repairs, remaining-life forecast; two roofs replaced on the forecast scheduleForFor the property management company

Nine office buildings on one maintenance contract since 2022. Two roofs replaced on the forecasted schedule rather than as emergencies; seven kept dry with semiannual visits. Zero interior leak claims across the portfolio in 2024 and 2025.

Metal roof panels being installed
Multifamily · 2023

Camelback Multifamily Re-Roof

Size22 buildings, 140,000 sq ftScopeModified bitumen torch-down replaced with 60-mil TPO, building by building, residents in placeForFor the owner

Twenty-two garden-style buildings with failed torch-down roofs. Re-roofed one building at a time with residents in place and a notice on every door 48 hours ahead. Fourteen weeks, zero resident relocations.

Next step

Have a project like one of these?

A Ridgeline estimator replies the same business day. Program clients reach a foreman on the 24-hour line, any time.

Demonstration site. Ridgeline Roofing is a fictional company. Designed and built by Ironsite Digital to show what a commercial roofing contractor's website should be. Want one like it?